Project Overview
Project Name :
Provision of Passenger Holding Area & Crowd Management Infrastructure — PVR Station
Principal Client :
Indian Railways
Client :
Central Railway – Solapur Division
Location :
PVR Station — Solapur Division, Central Railway, Maharashtra
Provision of Multiple Pedestrian Subways — KWV–MRJ Railway Section
DBP, in joint venture execution, secured and delivered a multi-location railway infrastructure project focused on the construction of pedestrian subways across the KWV–MRJ railway section under Central Railway. The project aimed to enhance commuter safety, improve pedestrian connectivity, and modernize railway crossing infrastructure using advanced RCC box installation techniques. Execution involved high-precision civil works, track safety coordination, and compliance with railway engineering standards. LOA NRK-DBP (JV) Provision of P…
Project Specifications
- Construction of 7 pedestrian subways at critical railway crossing locations
- RCC box casting and installation using air-pushing technique under live track conditions
- Earthwork excavation in soil and rock formations
- Wing walls, return walls, approach slabs & retaining structures
- Track safety works including temporary girder insertion and restoration
- Reinforcement steel fabrication and structural RCC works
- Concrete pavement and approach road development
- Drainage system integration with RCC pipelines
- Boulder backing, grouting, dewatering & structural stabilization
- Compliance with Central Railway engineering and safety standards
